Skip to content
Gen Power Solutions

Generators · Panels · Power Systems · Saudi Arabia

Power without borders.Generators, panels and power systems across Saudi Arabia.

Rental from 80 kVA to 1,000 kVA · Load banks from 30 kW to 3,200 kW · Testing, commissioning and responsive support.

●All major brands
0+13 services
●Kingdom-wide
●Documented results

One partner for the complete power chain

From the fuel tank to the load — every link engineered, tested and documented by one team.

Power on demand

Generators, resistive load banks and rack-mount units, ready for projects across the Kingdom.

Generator Rental

80 – 1,000 kVA

Standby and prime power generators with cables and accessories supplied.

Resistive Load Bank Rental

30 – 3,200 kW

Step-load testing, full-load heat runs and wet-stacking removal.

Rack-Mount Load Banks

6 – 10 kW

Compact units that simulate IT load for data hall commissioning.

Prove it before it matters

Six tests that confirm a generator will perform when it's actually needed.

  • Step-load testing
  • Full-load heat run
  • Voltage and frequency regulation
  • Transient response
  • Load-sharing verification
  • Wet-stacking removal
Plan a load bank test

How we work

Six steps, one accountable team, from the first survey to the final signature.

1

Site survey & assessment

2

Engineering & proposal

3

Manufacturing & supply

4

Installation

5

Testing & commissioning

6

Handover & support

One team accountable from the first survey to the final signature.

Kingdom-wide coverage

Five regions, every major city, and others on request.

NorthernTabuk · Hail · NEOM
WesternJeddah · Makkah · Madinah · Yanbu
CentralRiyadh · Qassim
EasternDammam · Khobar · Jubail · Al-Ahsa
SouthernAbha · Jazan · Najran

Why GPS

Multi-brand expertise

Hands-on with every major generator and controller brand.

One team, start to handover

Survey, engineering, manufacturing, installation, testing and support — one accountable team.

Panels built to purpose

ATS, synchronization, MDB, MCC and fully custom electrical panels.

Resistive load banks 30–3,200 kW

Prove performance before it's needed, at any scale.

Kingdom-wide coverage

Projects across every region of Saudi Arabia.

Documented results

Complete test and commissioning reports, every time.

Done right. Done safely. Documented.

  • Safe work practices, permits and isolation procedures
  • Calibrated test instruments
  • Manufacturer settings and recommendations followed
  • Complete test and commissioning reports
  • Clean, organized and respectful work sites
  • Qualified, experienced technicians

Watch GPS in action

Field work and commissioning, straight from site.

Frequently asked questions

Straight answers about rental, testing and coverage.

What generator sizes are available for rental?

GPS rents generators from 80 kVA up to 1,000 kVA, with power cables and accessories supplied, for projects throughout Saudi Arabia.

Do you support all generator and controller brands?

Yes. Our engineers work hands-on with all major brands and controller platforms, including ComAp, Deep Sea, Woodward, Basler, DEIF, Lovato, Kohler, Caterpillar, Olympian and others. Brand names are trademarks of their respective owners.

What is load bank testing and why does it matter?

A load bank applies a controlled, measurable load to a generator to prove it performs under real demand — step-load testing, full-load heat runs, voltage and frequency regulation, transient response and wet-stacking removal. GPS offers resistive load banks from 30 kW to 3,200 kW and rack-mount units from 6 kW to 10 kW for data hall commissioning.

Which cities and regions does GPS cover?

GPS serves the whole Kingdom — Northern (Tabuk, Hail, NEOM), Western (Jeddah, Makkah, Madinah, Yanbu), Central (Riyadh, Qassim), Eastern (Dammam, Khobar, Jubail, Al-Ahsa) and Southern (Abha, Jazan, Najran) regions, and other cities on request.

Can GPS manufacture custom electrical panels?

Yes — ATS panels, synchronization and load-sharing panels, MDB/SMDB, generator control panels, MCC, AMF panels, power distribution panels and fully custom electrical and control panels, including modification, upgrading, testing and commissioning.

How does GPS handle a project from start to finish?

Six steps: site survey & assessment, engineering & proposal, manufacturing & supply, installation, testing & commissioning, and handover & support — one team accountable from the first survey to the final signature.

Power that can't afford to fail?

Tell us what you need — we'll respond with a plan, not a sales pitch.

We'll only use these details to respond to your request.

CallWhatsAppQuote